Friday, November 30, 2012

The artificial greens


The artificial greens originated in the United States. Due to the scarcity of water resources in the United States, the day-to-day management of natural lawn and golf course greens maintenance, high maintenance costs, combined with spraying pesticides only pollute the environment but also damage to human health, in order to solve these growing problems, developed this low-cost, pollution-free, high simulation artificial greens. 

Artificial greens to give people the benefits, the first is its authenticity - synthetic grass in full accordance with the principle of bionics production, so that both the ball, playing sense, Jiaogan are not comparable with the natural greens so that people dare to abandon the natural greens replaced. 

Artificial greens the advantage lies in its material excellent guide, low cost, easy to maintain. As in the production process with a number of modern scientific and technological means, it has strong tensile strength, strong abrasion resistance, strong flexibility, strong drainage and strong anti-fade resistance. The artificial greens advantage also lies in the characteristics of the environmental pollution. 

Its material does not contain any harmful substances, and have to absorb noise function without spraying without sprinkler irrigation without pruning perennial reach golf tournament standards, both to save the artificial maintenance costs of expensive natural greens (lawn), but also to avoid long-term facilities sprinkle environmental pollution caused by pesticides cause harm to human body and many other disadvantages.

Thursday, November 29, 2012

Synthetic grass soccer pitches Details


Synthetic grass soccer pitches Details

According to the characteristics of football and FIFA (FIFA) technical standard requirements, relying on a strong R & D force, a collection of a variety of artificial turf in a financial state-of-the-art football field artificial grass products for the needs of different users, fromhigh grass 55mm to 64mm have a variety of different models to choose from.

Features:
1, simulation and high grass fibers soft, no harm to the skin a few;
2, strong abrasion resistance and long service life;
3, anti-UV, corrosion-resistant, mildew, and environmental pollution, does not fade;
4, football speed rebound almost identical with natural grass;
5, good air permeability and drainage performance;
6, excellent traction, so athletes can accurately determine the direction of movement of the ball;
7, seams, and no traces.

Wednesday, November 28, 2012

Synthetic grass playground


Artificial turf adopted the principle of bionics, movement Jiaogan, very close to the ball rebound speed and natural lawn, and has good water drainage after heavy rain can quickly clean. In addition to the excellent performance of a variety of natural lawn special wear-resistant and provides a five-year warranty.

Artificial turf all-weather venue, completely free from rain, snow, weather. In the cold, high temperature and other extreme climate region. All playground planning by artificial turf characteristics into a plane, without any asperities, and this new structure has damping Less noise function, therefore, safe and quiet, can reduce the playground noise interference class situation.

Synthetic grass playground to take the concept of security, therefore, is more suitable for use in schools, on the artificial turf to run fast, to participate in the competition the official competition PU runway, will run faster, and do not lead to sports injuries due to improper flexibility concerns. Colorful, durable non-fade, easy maintenance, matching with the surrounding environment and buildings, is the best choice for sports venues.

The football venue rectangular, its length shall not be greater than 120 meters, or less than 90 meters, width shall not be greater than 90 meters, or less than 45 meters. In any case, the length must be more than the width. FIFA (FIFA) recognized venue specifications of 105 x 68 meters. 

Standard venues the length of the line is known as the sideline, the line width of the standard venue called the end of the line. The entire venue is surrounded by two even strip edges and two end lines, the line width (12 cm) are included in the venue (see below), and the surrounding buffer of not less than 2 meters.


Tuesday, November 27, 2012

Kindergarten grass at VIVATURF


Grass height: 32 mm
The denier: PE/8800DTEX of the grass fiber material /
Line spacing: 3/8 in.
Stitch length: 14 pin / 10 cm
Color: Green
Base fabric: PP + non-woven

Product Description:
The synthetic grass to add anti-aging agent, anti-UV agents, and the use of international advanced technology and refined, with a similar appearance and performance with natural grass, grass silk soft high, good elasticity, good resilience after the weight flexible wear-resistant, fire retardant, anti-aging, heat insulation and waterproofing, drainage speed, durability, anti-UV, anti-corrosion, mildew, environmentally friendly, easy maintenance, etc.

VIVATURF Co., Ltd. is an the southwest region most professional artificial turf production, sales and installation services in one integrated company, its main products: artificial turf and golf practice supplies. Products low in the high-end models complete, high quality, affordable; courteous service company in good standing.

And undertake the design of the golf green engineering and artificial leisure lawn, as well as a variety of sports projects, the company has a professional construction team, enthusiasm and thoughtful service for you.

Monday, November 26, 2012

Futsal venues supporting and rules


Team number and team equipment:
A Futsal should be between two teams, each team playing no more than five players, which must have one goalie. Either team in the game players fouled out, making it less than two field players, the game abstained. The official game, available substitutes. Each team shall not be more than seven substitutes.

(1) the replacement of the players: five-a-side football competition to replace players with 11 people system is different, it can be replaced in the game unpaired dead ball, called the "motor replaced. Motor Replace must be carried out according to the following requirements:
a leave players must leave the replacement region from the sideline.
b playing players must also comes into play from the replacement area and must leave players completely taken the sideline before admission.
c. the substitutes Whether playing or not, the referee is entitled to its duties.
d. become substitutes Admission field team, to be replaced at the same time the team is no longer played field team, bringing replace end.
the e motor Replace unlimited, was substituted players can re-Subs other players.

(2) Penalties: "motor replaced in the game, substitutes substitutes have not yet completely leave on approach, the referee should immediately stop the game, players leave to be replaced by the main referee make, admission substitutes given a warning by the other ball location when the game was stopped indirect free kick to restore the game. If the ball in the penalty area, you should stop the game when the ball away from the location of recent Vermicelli execution. If a replacement team is not in the replacement area, the referee should immediately stop the game and warn the players, by the main referee in the game was stopped by the other the ball location indirect free kick game resumes. If the ball in the penalty area, you should stop the game when the ball away from the location of recent Vermicelli execution.

(3) replacement goalkeeper: Rules replacement goalkeeper shall be carried out in the dead ball. The goalkeeper also interchangeable with any other field players position, subject to prior notification to the main referee should race into a dead ball.

(4) A member equipment: rules, players may not wear any equipment endanger other players.
a. players usually equipped shirt, shorts, socks, shin pads and shoes. The only training shoes made of canvas or soft leather shoes, the sole application of rubber or other similar material. The players are allowed to wear sneakers.
team jersey must have a number, with the team members may not use the same number;
c. goalie can wear trousers, the color of their jerseys should be significantly different from the other players and referees;
d. shin pads should use materials made of (rubber, plastic, polyurethane, or other similar materials) can play a protective role, and wrap with socks for the Ministry. Race timekeeper by the main referee is responsible for the timing. In this case, the coaches can move the adjournment request to the Assistant Referee.

(5) Suspension: futsal competition rules allow pause. That each half of each team can have a one-minute pause, and to comply with the following requirements:
only teams coaches have the right to propose to the timekeeper suspended;
race into a dead ball, the timekeeper can be different from the referee's whistle or other audio signal suspended the game;
after a pause, both teams should stay at the venue and receive instructions, not the players made a special trip to stay in the sideline parallel to the bench, and guidance personnel can not enter the venue;
d., such as the first half did not use the "pause", the second half can only be suspended once. International the Football Council resolution pointed out that the whole game ended in a draw, in accordance with the competition rules, the need for overtime, no pause in overtime during.

Sunday, November 25, 2012

Golf course construction program design


The construction program of the golf course design and construction:
The first step in the design of the building of the golf course construction program: project preparation phase services include: the golf project site, the golf professional consulting Golf Local Market research, the overall project planning and design, produced a blueprint for the overall design.


The second step of the design and construction of golf course construction program: construction stage work includes: golf driving ranges, engineering organizations, engineering plans, project arrangements; preparations for the various projects of the golf driving range; experienced engineering and technical personnel for project implementation; strict the owners' request and Golf engineering standards, complete all Golf and projects.


The third step of the design and construction of the golf course construction program: operation and management stage work includes: In order to fully protect the driving range of engineering quality and market cultivation, can take on the driving range early 1-2 business management; provide owners with professional marketing plan and marketing; Hengtai letter, contracting driving early operating rights, self-financing; effective day-to-day maintenance of the driving range, maintenance, management, asset protection; driving range of management talent cultivation, the late management for owners to undertake.


Water golf driving range practice studio for the broad surface of the water on the shore, you can set up one or two hitting bays, use of driving range equipment is basically the same driving range and on land, at three:
First, golf is a floating ball, floating in the water, and general golf;


Second, there is no grass but the surface of the water, with floating as "Water greens, made at different distances logo is the goal of hitting a ball with a big circle in the water;


Third, do not pick up the ball machine, but with speedboat salvage recovery golf, wash the ball again after use.
Water golf driving range is not a fun driving range, practice the basic techniques of golf, entertainment fun, but it must be in the wide and calm lake restrictions ball floated off the range of the maximum water network, but also slower to recover the ball more.


Landscape greens practice we usually do one of the synthetic grass greens, clubhouse select products, it is very economical, attractive, durable, this green grass manufacturers specifically for golf greens and production push The rod speed changes from the eleven years we have a golf professional stylist design, real grasp the line of the putt, so every user to practice various putter's efforts to achieve the purpose of the exercise.

Thursday, November 22, 2012

synthetic grass for home


Based on our experience of world markets, we design and develop new generation artificial grass for landscape and sports surfaces. Our yarn is completely environmentally friendly without any heavy material. We pass all the tests according to DIN 18035-7 norm. In order to make sure every inch of Viva products is qualified and manufactured according to customer requests, we have more then ten tests at various stages from raw material to the half-done product artificial sports grass to the finished product.

We require our team to always think ahead of our customer and always do everything in advance. Nice artificial grass for Schools-Schools and nurseries are frequently choosing artificial turf as their preferred flooring solution. The soft child friendly surface provides and excellent kids play environment for playgrounds, sports fields or even indoors.

Shock pads (referred to as the e-layer) provide a cushion beneath the synthetic grass turf surface. The impact of a child falling on the artificial grass is absorbed by the padding, providing critical fall heights up to 2.7 meters.

VIVATURF synthetic grass has extensive experience in the manufacturing, construction, installation and development of synthetic turf systems for landscaping, leisure, playgrounds and mini sports installations. We have the knowledge and skills to advise you on each system. Our product range is suitable for almost any flooring application.

VIVATURF has developed a wide range of product for every use and application. Within this wide range it has selected 4 preferred stock range products for speedy expedition. These products are Luna, Terrazzo, Natural Plus and Dees. The VIVATURF artificial grass range of synthetic turf is produced with the latest advanced technology to offer you a solution for your garden, with our range of turf looking virtually indistinguishable from real grass. With water conservation at the forefront of our priorities today, the time to start using VIVATURF artificial grass has never been more environmentally important or cost effective.